Logo, colour and label application
Requires approved artwork, placement direction and production review.

OEM & ODM
Customisation is handled as a controlled evaluation with named inputs, outputs and approval gates. Scope is confirmed before it becomes a production instruction.

Evaluation scope
These are discussion categories, not a promise that every option is available for every model, order or market.
Requires approved artwork, placement direction and production review.
Requires channel, handling, language and logistics inputs.
Requires the target market, language and current file-status review.
Requires engineering, safety and compatibility review before quotation.
Engineering boundary
Safety-critical structures, control logic, compliance scope, tooling, timing and minimum quantities are not published as pre-approved options.
Cooperation timeline
Buyer market, product, volume, application and requested change are recorded.
Manufacturing feasibility, safety impact and document implications are identified.
Approved items, open questions, exclusions and the commercial basis are aligned.
The agreed proof method is completed and the accepted state is recorded.
Only the approved specification and assets move into the production handoff.
Configuration, records, packaging and the applicable document set are reconciled.
Inputs & deliverables
Every workstream records what the buyer supplies and what the review can return before an approval decision.
| Workstream | Buyer input | Review output |
|---|---|---|
| Product requirement | Target market, intended use, volume and requested configuration | Feasibility questions and the configuration review record |
| Brand application | Approved logo artwork, colour reference and placement direction | Application proof for buyer approval before release |
| Packaging & labels | Market, language, handling and channel requirements | Reviewed artwork scope and packaging handoff record |
| Documents | Required language, market and buyer document list | Availability status, gaps and model-specific release scope |
Approval gates
The agreed proof method, accepted configuration, artwork and open items must be identifiable before production release.
Output: an approved reference stateThe production instruction, inspection scope, packaging assets and document status must refer to the same approved configuration.
Output: a controlled handoff packageOEM project intake
Provide the target market, product family, expected volume, requested changes and available artwork or specifications for evaluation.